CONTRACTOR TRAINING MATERIALS

FIBERGLASS TRAINING INFORMATION

1.877.CSI.TANK

lUNCH & LEARN | qUICK cONTACT | rEQUEST-A-QUOTE

Complete Installation instructions and supplemental instructions for all CSI products can be found on this website or provided upon request. We have worked hard to build a comprehensive and easy-to-understand document/media library to support proper and safe installations of all of our environmentally conscious products.

 

Training Materials

This section includes printable and downloadable documents for standard installations. You will find supplemental documents here for atypical excavations, applications and more. All PowerPoint® installation instructions and installation exams are available for downloading in this section.

 

Please Note: Your work is crucial in assuring long-term tank performance.  Improper installation can lead to tank failure, product release, and environmental contamination.  Because proper installation is critical, successful contractors should make sure their crews receive proper education in Containment Solutions installation procedures.

 

We strongly encourage you to contact your local sales representative several weeks before tank delivery, to schedule a contractor training session for your crew.  Should you decide to proceed with training on your own, below are links to the publications required to complete our contractor training program.

 

Once the presentation is concluded and the exams have been taken, a Confirmation of Training -  Attachment E form must be completed and submitted to CSI prior to tank delivery.  To obtain a copy of the Confirmation of Training - Attachment E form, please call your local sales representative.

© 2021 Containment Solutions, Inc.  All rights reserved.

 

Installation Instructions

Fiberglass Tanks Installation Instructions (Pub No. INST 6001)

Confirmation of Training - Attachment E (Pub No. INST 6040)

 

French Canadian Literature

Fiberglass Tanks Installation Instructions (Pub No. INST 6001 FRE)

Single-Wall Sump Installation Instructions (Pub No. INST 6030 FRE)

 

Spanish Literature

Fiberglass Tanks Installation Instructions (Pub No. INST 6001 SPA)

Single-Wall Installation Instructions (Pub No. INST 6030 SPA)

Double-Wall Installation Instructions (Pub No. INST 6034 SPA)

 

Sumps

Single-wall

Installation Instructions (Pub No. INST 6030)

Double-wall

Installation Instructions (Pub No. INST 6034)

Attachment E Form

 

Supplemental Documents

Access Riser Installation Instructions (Pub No. INST 6056)

Alternate Tank Installation Methods (Pub No. INST 6060)

Berm Installation Instructions (Pub No. INST 6022)

Brine Monitoring Fluid MSDS Sheet (Pub No. INST 6069)

Deadmen Layout by Tank Size (Pub No. TNK 1062)

Fiberglass OWS Installation Instructions (Pub No. OWS 2013)

Flexible Connector Specification  (Pub No. SPEC 9005)

Lifting Tanks Using Slings (Pub No. INST 6021)

NYC Special Installation Instructions (Pub No. INST 6008)

Setting Monitoring Fluid Levels (Pub No. INST 6020)

Split Strap Anchor System Installation Instructions (Pub No. INST 6063)

Standard Hold Down Strap Anchoring Installation Instructions (Pub No. INST 6062)

Urea DEF Tank Supplemental Instructions (Pub No. INST 6052)

Wire Rope Over Tank Top (Pub No. INST 6047)

 

For access to the Contractor Training Materials (Exams and PPTs) please view this site on a computer or call 1.877.CSI.TANK

 

Request-A-Quote